Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/grenelpo/public_html/wp-includes/functions.php on line 6131
Electrical – grenelpowers

Client Electrical

Infrastructure - Electrical Test Equipments

S.No Name of the Test Kit Total
1 Three phase automatic Relay test kit OMICRON CMC 356-6 02 Nos.
2 Single phase Relay test kit 05 Nos.
3 LAPTOP( DELL , hp, Lenovo, IBM, acer, TOSHIBA) 40 Nos.
4 High-Voltage Tan Delta Test Kit 01 Nos.
5 Contact Resistance Test Kit 07 Nos.
6 Knee Point Test Kit 03 Nos.
7 Transformer Turns Ratio Test Kit 02 Nos.
8 Single Phase /Three Phase Auto Transformer 10 Nos.
9 Loading Transformer 10 Nos.
10 Step-Up Transformers 06 Nos.
11 Power System Analyser 01 Nos.
12 Digital /Analog Megger 15 Nos.
13 Digital/Analog Clamp on meter 15 Nos.
14 Earth Resistance Tester 06 Nos.
15 Digital Leakage Tester 10 Nos.
16 Three pole Time Interval Test Kit 05 Nos.
17 Digital Timer 02 Nos.
18 HI-POT Test Kit 05 Nos.
19 Phase Sequence Meter 10 Nos.
20 Erection tools / Retrofit Tools kit 05 set
21 Digital /Analog Multi-Meter 20 Nos.